top of page

Construction Update 10-25-19

Park District


The Abbot


This week, wall panels continued to be placed on level 8. Joisting and decking for level 9 will follow with the first level 9 pour expected to occur next week. The tower crane has been re-inspected and is back in service on the South core, which is making its way to the 12th floor. The North core work is on hold pending review of an engineer’s report which is expected in the near future.


Underground utility work is expected to take place the week of 11/4. This will necessitate a lane closure of Grand River during a portion of the work to allow connections to take place. As the details of the plan are set, more information will be provided.


The Graduate Hotel


The 3rd floor concrete was poured today. The final pour for the 3rd floor is planned to occur within the next two weeks. Metal panels will be installed as the project makes its way upward. Work on the underground utilities on site is nearly completion, with slab-on-grade concrete pours anticipated for the near future.


Center City


100/200 Block of E. Grand River Ave. Alley (East End) Closure, Wednesday 10/30


On Wednesday, 10/30 the east end of the 100-200 block of E. Grand River Alley, will be closed to through traffic as a crane will be located in the private parking area and alley, behind Pita Pit and Mackerel Sky. The crane will be hoisting materials to the roof of the Landmark Building.


The 12 story Landmark Building is complete.


The Newman Lofts building is nearing completion and a Temporary Certificate of Occupancy has been issued. Residents have moved into the apartments. The parking deck is open and accessible to the public. Tenant spaces on the ground level are progressing with various general contractors completing this work. Fosters Coffee is now open.


Thank you for your patience during the construction downtown. Please remember to sign up for downtown East Lansing construction alerts by texting ELBUZZ to 38470. You can also visit www.EastLansingBuzz.org to find the latest information about the construction in downtown East Lansing. As always, you can reach the City Construction Communication Team at construction@cityofeastlansing.com or (517) 319-6930 with any questions.